Specialist Plant Associates
Airfield Road
Hinwick
Wellingborough
Northants,
NN29 7JQ
Tel: 0044 1234 781 882
Fax: 0044 1234 781992
Email: info@specialistplant.co.uk
|
|
Rail
Tunnel Repairs
| Ventilation equipment for all works carried out in any
size or length of railway tunnel. Specialist Plant has built
up a wealth of experience on new construction and repair works.
Engineers examine the existing tunnel ventilation conditions
and the work cycles proposed during repair/construction works.
From this assessment a recommendation is submitted for discussion.
Solutions may use ducted fresh air or extraction of fumes
and dust, or generate a through flow of air in the main tunnel
air-body. We carry a large stock of fans – up to 1.6
metres in diameter, 60 kilowatts in power. Our site experience
allows us to keep in touch with customers, assess the project
as it progresses and monitor air flows and atmospheric conditions. |
We also supply and install complete pipe work systems for air, water
supply, water pumping, and concreting. Work carried out includes:
- Covered Ways tunnel rebuild – District and Circle line
- North Downs tunnel – Channel Tunnel Rail Link
- Strood and Higham tunnels – Reconstruction work
- Prestbury & Hibel tunnels enlargement – WCML blockade
- Arley Tunnel Refurbishment – near Nuneaton
- Thames tunnel – Concrete lining of Brunel’s original
- Baker Street – P & C replacement – 2 weekend
possessions
- Chipping Sodbury tunnel - Drainage works
|
|
| |
|